Pre Engineered Buildings
Production Hall
Pre-engineered production hall for Fast Cables Limited, covering 58,293 Sft and completed in 4 months.
Project Description
Premium Engineering delivered the Production Hall as a pre-engineered building project for Fast Cables Limited. The project covers 58,293 Sft and was completed in 4 months.