Light Gauge Steel Frame

View our products


Light Gauge Steel Frame (LGSF) is a cold rolled load bearing steel framed wall system with an established history as an innovative and reliable construction material in World. The inherent strength and design flexibility of LGSF construction enables increased spans, custom openings, curved walls and a variety of external architectural façade treatments; making it a versatile choice of construction material. Our design philosophy is focused on rationalising the structural elements within the building to provide a more efficient construction programme and cost effective build methodology.



Our LGS Products

Service Hole

The service hole is available in one of several sizes which can be selecting
when placing an order. A service hole can be punched into the studs
and plates wherever cabling and plumbing is required

Dimple

Dimple

The dimple holes are punched in the center of the flange. They allow location of the studs and are proceed so that the head of the screw does not protrude

Swage

Swage

The swage crimps the section allowing it to fit inside the plate or nog while keeping the overall external sizes and the same for both plates and studs

Web Notch

Web Notch

The Web Is notched out to allow one stud passes through another. it can be used by itself or in conjuction with lip notch

Lip Notch

Lip Notch

The lips are notched out to allow the stud to pass through it can be used by itself or in conjuction with the web notch



LGS CYCLE

cycle-image

All Shapes All Sizes

From a single indoor court to a leisure complex complete with fitness suite, café and studios, we’ll build a facility your people want to use.

project image

EMPORIUM MALL LAHORE

CLIENT : Gurantee Engineeres

CONSTRUCTION AREA: 4,26,300 sft

COMPLETION TIME: 6 Months

project image

HPTC

CLIENT : IDAP

CONSTRUCTION AREA: 35,200 sft

COMPLETION TIME: 4 Months

project image

CS BLOCK EXTENSION

CLIENT : Universty of Lahore

CONSTRUCTION AREA: 17,000 sft

COMPLETION TIME: 4 Months

project image

TEMPORARY SITE FACILITY

CLIENT : Descon Engineering(pvt) Limited

CONSTRUCTION AREA: 65,833 sft

COMPLETION TIME: 3 Months

project image

CHILD CARE CENTER

CLIENT : Agha Khan Hospital

CONSTRUCTION AREA: 9,000 sft

COMPLETION TIME: 4 Months